Repository logo
Communities & Collections
All of Repository
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "MEKLIT GIRMA"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    DISTRIBUTION SYSTEM RELIABILITY IMPROVEMENT USING DISTRIBUTED GENERATION AND NETWORK RECONFIGURATION
    (Hawassa University, 2021-10-28) MEKLIT GIRMA
    Power supply reliability is the basic issue for economic and technology development of the country. The sufficient or adequate and secure supply of power will assure the reliability of the system. Unreliability of the system occur due to high outage frequency and duration, system overload and unsecure system or protection system. When the distribution system is reliable, it has capacity to meet the demand of customer and operate under adverse condition. Arbaminch distribution system has encountered frequent power interruption and power quality problem. The interruptions are mainly caused by system overload and short circuit fault. The reliability of the distribution system is assessed based on the data from Ethiopian Electric Power Corporation. Arbaminich substation of feeder -05 is selected as case study, which has high rate of interruption. Feeder -05 has SAIDI value of 236.8386 Hr./cust. /yr. and SAIFI of 221.6338 f/cust. /yr. The reliability indexes values of feeder -05 are not within the ranges of bench marks of reliability requirement. This thesis focused on reliability improvement of distribution system with better placement of distributed generation and network reconfiguration. Particle swarm optimization algorithm is used for placement of DG, size and network reconfiguration. The algorithm is done using MATLAB 2016 software. Based on the availability in the area, efficiency, cost and emission level, Solar and Microturbine sources are used as distributed generation. The suitable site and size of DG are found at bus 10 with suitable size 4.5 MW. For network reconfiguration sectionalizing switch is used. Before reconfiguration the switch was placed at bus 20, 21, 22,23 and 24. During network reconfiguration switch changed to bus 3, 4,12,24 and 31. The reliability indices SAFI, SAIDI and EENS value improved by 82.81%,78.89% and 78.10% respectively after DG with reconfiguration used. Expected interruption cost before applying the proposed method is 9,758,852$ /year. After the proposed method used expected interruption cost reduced to 2,995,270$ /year. This indicates that, 6,763,582 $/year is saved after using the proposed techniques
Useful Links
  • Web Site
  • E-Learning
  • Library
  • SIS
  • Portal
Library Contact

Library Service Directorate

Phone: +251 46 212 2594

Email: library@hu.edu.et

Repository Links
  • Home
  • Browse Collections
  • Submit Research
  • Help & Support
Copyright © 2026, Hawassa University.