PRODUCTIVITY ENHANCEMENT FOR JOB SHOP SCHEDULING PROBLEM USING GREY WOLF OPTIMIZATION (GWO) ALGORITHM: (CASE STUDY OF AKAKI BASIC METAL INDUSTRY)
No Thumbnail Available
Date
2023-10-22
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Hawassa University
Abstract
Ethiopian metal manufacturing industries are struggling with a long manufacturing cycle,
which results in lower efficiency. Because of issues with improper job allocation on the given
machines and machine failure, Akaki BMI has performed significantly worse than other
major metal industries in Ethiopia.
The necessary data was gathered from company reports and questionnaires in order to
investigate existing issues that impede industry productivity. The sample size considered is
107, of which 98 completed and returned the questionnaires on time, yielding a response rate
of approximately 91.6%. It was determined that the major issues affecting Akaki BMI's
productivity are related to machinery failure and scheduling. The industry employs a First
Come First Serve (FCFS) scheduling method. Thus, the main concern of this research was to
pinpoint the causes of the aforementioned problems and to look for different alternative
mechanisms/techniques to come up with the best solution.
The solution to scheduling problems is presented and analyzed using the LEKIN and
MATLAB software. From the study analysis, GWO based scheduling has better to increase
productivity by reducing the makespan, total flow time, total tardiness of the jobs and energy
consumption of each machine in the machine shop during both operation time and idle time .
Finally, the findings of the study using FCFS and GWO algorithms showed that the
makespan 385 & 225 minutes respectively, which is reduced by a 41.56% improvement,
total flow time 5010 & 3840 minutes respectively, which is reduced by a 23.35%
improvement, total tardiness 2778 & 1553 minutes respectively, which is reduced by a
44.1% improvement, total energy consumption during operation time of the machines shop
1314.53 & 883.9 kWh respectively, which is reduced by a 32.76% improvement, total energy
consumption during idle time of the machines 888.625 & 449 kWh respectively, which is
reduced by a 49.47% improvement, and the machine productivity could also be improved by
41.55% per machine/minutes improvement
Description
Keywords
Akaki BMI, First Come First Serve, Flow time, Grey wolf optimization, Local search, Makespan, Scheduling, Tardiness