    PERFORMANCE EVALUATION OF STORMWATER DRAINAGE SYSTEM OF BEDELE TOWN
    (Hawassa University, 2020-10-24) YEROSAN KEBEDE AYANA
    Various factors can degrade the drainage system and reduces its performance. As the role of drainage infrastructure is very high in preventing urban floods, their performance should be monitored and quantified. This study aimed to assess the performance of stormwater drainage systems in Bedele Town. Primary and secondary data were used in this study. The catchment that contributes runoff was delineated using ArcGIS 10.4 software. The Stormwater Management Model (SWMM 5.1) was used to simulate the peak flow rate and water level in the drainage canals by considering the current land use. The intensity duration frequency (IDF) curve was developed by using the Log-Pearson Type III. The peak runoff for 10-year and 25-year return periods was estimated by using the Rational Method. The condition of the existing drainage system was assessed and poor solid waste management, lack of well-connected drainage lines, poor liquid waste disposal, and the existence of fully uncovered areas in the town with drainage structures were identified to be the drainage problem of the Town. From the total area of Bedele Town, 41.1% is uncovered with the drainage systems. The total peak runoff generated from this study area is 15.59 m3/s and the average velocity was 2.5m/s for a 10-year return period. The result from the Rational method as well as SWMM 5.1 shows there is an overflow problem in this study due to the presence of drainage canals with insufficient capacity to carry the runoff generated from this catchment. For a sustainable drainage system, the appropriate use of hydrological analysis, hydraulic design, and stream morphological study should be implemented before carrying out the construction of drainage structures for they were not considered during the construction of the drainage system of the Town. Regular maintenance and frequent clearance of drainage lines, proper integration between roads and drainage structures, provision of additional drainage canals, and improved stormwater management were recommended to solve the stormwater drainage problem of the Tow