DEVELOPING OPTIMAL RESERVOIR OPERATION (CASE OF KOKA MULTIPURPOSE RESERVOIR, ETHIOPIA
No Thumbnail Available
Date
2023-07-18
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Hawassa University
Abstract
Reservoir operation is the most challenging task in the management of water resources
systems. Hence, water resources models are needed to minimize these challenges, as much as
possible if they are supplemented with sound engineering judgments. In this study, the rainfall runoff simulation HEC-Hydrologic Model System (HEC-HMS) and reservoir simulation model
(HEC-ResSim) were applied to the koka multipurpose reservoir to optimize the power
fluctuation observed and water scarcity due to reduced water release from the reservoir. Inflow
was generated by the HEC-HMS model by using twenty years of daily meteorological data
collected from NMA. The generated inflow was calibrated and validated with 16 years of
observed flow data from Melka Kunture, Hombole, and Mojo gauging stations. The
performance of the model was evaluated by NSE, R2, RMSE, and PBIAS performance indices
criteria reviewed in different literature. For example, the NSE value of Melka Kunture,
Hombole, Mojo, and Koka Inlet is 0.75, 0.78, 0.63, and 0.8 for calibration, and 0.7, 0.72, 0.53,
and 0.75 for validation, respectively. The value of R2
for Melka Kunture, Hombole, Mojo and
Koka Inlet is also 0.74, 0.77, 0.64 and 0.77 for calibration and 0.74, 0.75, 0.52 and 0.76 for
validation respectively. Although the model slightly underestimates the flow, for both
calibration and validation, the model shows acceptable performance to generate an inflow of
the upper awash watershed. To simulate the reservoir the inflow generated by the HEC-HMS
model, reservoir physical, and operational data were collected from governmental
organizations and provided to the model. Since the HEC-ResSim model cannot optimize the
constraints directly, trial and error have been applied through a prioritization rule between
three main demands; i.e., Hydropower, Irrigation, and Domestic, Municipal and Industrial
demands. The best alternative was selected based on the power target, release target, and pool
elevation target. Accordingly, from the three alternatives applied in the simulation, ALT-1
gives maximum power and maximum release that supports the downstream water needs. When
power demand was given the highest rule priority, the reservoir generate an average energy
of 504.76MWh per day or 55GWh per year which is greater than the power generated in ALT-
2 and ALT-3 by 32% and 64%, respectively. The reservoir reaches its minimum elevation of
103.93m in June (except in the drought year of 2003 and 2016) and its maximum elevation of
110.39m in August. Generally, the reservoir can support the downstream water needs safely if
the operation will be conducted by the power demand priority rule.
Description
Keywords
HEC-HMS, HEC-ResSim, Flow Generation, Reservoir Operation, Rule Priority