URBAN WATER SUPPLY SYSTEM PERFORMANCE ASSESMENT: THE CASE OF ASSOSA TOWN, ETHIOPIA

dc.contributor.authorABEBE AMADO MENTOSEA
dc.date.accessioned2026-02-19T05:44:53Z
dc.date.issued2022-10-23
dc.description.abstractIntermittent water disruption is the key problem of many water authorities in developing countries including Ethiopia. Water demand has been increasing significantly in most cities due to population growth and other factors. As a result, town water utilities are struggling to provide customers with adequate and reliable water supply service despite obstacles that hinder water utilities not to provide the required service. This study assesses the performance of Assosa town water supply system based on main performance indicators namely Demand and supply, water loss, water quality, customer satisfaction, and. operation and maintenance. These indicators have been cited as the main factors, which reflect the performance of many urban water supply systems. High water loss, customer complaints, and operation and maintenance problems indicate that there are deficiencies in the quality of the service. To conduct this research, data of water production and consumption, water supply system data were obtained from the water utility records, other data not found in the water utility records is collected using instruments. Hydraulic performance of the system is also evaluated by modeling the system. Water quality tests were conducted and compared with the national and international standards. Household interviews were made to understand customers’ satisfaction towards the water supply. There is a frequent interruption of boreholes. The water quality test shows some parameters departed from the standard set on the Ethiopian and WHO water quality guidelines. In addition, there is customer’s complaint towards continuous access of water. The operation and maintenance in the town is identified to be poor. In conclusion, the town’s water supply system is poor in managing water loss, water quality, operation and maintenance with the worst condition of continuous generation of water from sources continuously interruption. It is recommended that the water utility develop a strategy and work hard on the indicated system deficiencies especially on operation and maintenance to improve the water supply system performance and provide customers with good quality service
dc.identifier.urihttps://etd.hu.edu.et/handle/123456789/962
dc.language.isoen
dc.publisherHawassa University
dc.subjectwater loss
dc.subjectoperation and maintenance
dc.subjecthydraulic water CAD modeling
dc.subjectAssosa Town
dc.subjectBenishangul-Gumuz region
dc.subjectEthiopia
dc.titleURBAN WATER SUPPLY SYSTEM PERFORMANCE ASSESMENT: THE CASE OF ASSOSA TOWN, ETHIOPIA
dc.typeThesis

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Final Thesis-2022G.C (Abebe Amado).pdf
Size:
3.63 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description:

Collections