Civil Engineering
Permanent URI for this collectionhttps://etd.hu.edu.et/handle/123456789/675
Browse
17 results
Search Results
Item EFFECT OF ROAD GEOMETRY AND SPEED ON ROAD SAFFTY AND IDENTIFICATION OF HAZARDOUS ROAD SECTION (CASE STUDY ON THE WUKRO-ADIGRAT-ZALAMBESA ROAD(Hawassa University, 2018-10-23) RAHMA AHMED EBRAHIMIn Ethiopia road traffic crashes are causing heavy loss of human and economic resources with the relatively low road network and motorization level. The risk is increasing with the increase in population, the road network expansion with little consideration of safety, and the increase in motorization with the vehicle fleet generally in poor conditions.This thesis deals with the most essential issue of road traffic accident related to geometric characteristics, flow and speed and identification of hazardous road section on the Eastern Tigray Zone (Wukro-Adigrat Zela'ambesa ) two lane road. The main objective of the study is to develop a prediction model for road traffic crashes occurring on a two lane road and to identify the hazardous road section.The study area has a total length of 96 km. Data such as crash data, traffic flow data, speed data, roadway characteristics and road geometry data was collected from offices and the site. Two models were developed one for the geometric characteristics of the road and flow model, the second for the speed model. The statistical analyses were performed using statistical software package SPSS version 20. The Generalized Linear Model (GLM) with Poisson regression and Negative Binomial (NB) the error structure was used to estimate the model parameters. From the two models the negative binomial model was fit to the data. The results show that number of vertical curve, number of vertical grade, no of horizontal curve, speed, shoulder width, were found to be statistically significant explanatory variables (p < 0.05) for crash involvement and when the crash rate relates to the speed it is statically significant for the crash rate. After calibration the model was validated using data from similar road on Mekelle-AbiAdi road. And the result has shown it is not validate on the similar road. For the identification of hazardous road section Empirical bays method was used. Results indicate that from the total 96 km road sections 25 sections were highly prone to accidents with PI EB values. Possible solutions are using traffic signs, user awareness campaigns, policy revisions, and permanent geometry and pavement modifications.Item DEVELOPMENT OF PASSENGER CAR EQUIVALENT FOR SIGNALIZED INTERSECTIONS (BASED ON A STUDY CONDUCTED AT SELECTED FOUR SIGLALISED INTERESECTIONS OF HAWASSA CITY, ETHIOPIA(Hawassa Unversity, 2018-10-22) THOMAS BEZABIH BASHEThe number of passenger cars displaced in a traffic flow by a truck or a bus, under the prevailing roadway and traffic conditions is called Passenger Car Equivalent, Highway Capacity Manual (2010), where estimating it was the basic objective of this dissertation with all other vehicle categories available at signalized intersection of Hawassa City, Ethiopia. Data was collected from four signalized intersections using digital video recorder which is followed by extraction of the time headway. An analytical model was developed to simulate headway values based on total travel time and vehicle type. This model was used to estimate headways of Motorcycle, Auto rickshaw, Passenger cars, Light Duty Vehicle and Heavy Vehicles which are then used to estimated PCE of each vehicle group. Time headway ratio method was chosen for the analysis and estimation of PCE, for it was found to be utilizing such a dynamic characteristic of traffic stream (i.e. headway) which is able to explain driver behavior, roadway surroundings, traffic volume and speed characteristics through a single parameter. The PCE factors of Motorcycle, Auto rickshaw, Light Duty Vehicle and Heavy Vehicle are found to be 0.552, 0.701, 2.004 and 2.967 respectively. The PCE factor value of Motorcycle used by the local standard book, Ethiopian Road Authority, Geometric Design Manual (2013) is less than half of the calculated finding of the study; similarly, for Auto rickshaw the ERA provision is slightly larger than half of the calculated value of this study. The absence of PCE for Light Duty Vehicle and Heavy Vehicle groups and deviation of PCE factors for the remaining vehicle groups from this study result indicates a significant quantity of calculations involving PCE, such as saturation flow rate and thus influences the design of signalized intersections. Finally, it is suggested that the values obtained in this study can be used as a guideline in the design and analysis of signalized intersections in Hawassa City as well as in EthiopiaItem IDENTIFICATION OF COLLAPSIBILITY POTENTIAL OF SOILS ALONG SHASHEMENE – AJE ROAD CORRIDOR: AMBURE SITE(Hawassa University, 2018-10-27) ASHEBIR TAJEBE BEDADALarge areas of the earth’s surface are covered by soils that are susceptible to large reduction in bulk volume when they are near to saturation (Knodel, 1992). These soils are termed as collapsing soils and are common in many parts of Ethiopia. This study is concerned with the identification of the collapsibility potential of soil found along Shashemene – Aje road corridor, in particular at Ambure site, Western Arsi zone, Ethiopia. The study was carried out as relatively little is known about the collapse phenomenon in the silty/ fine sands. The aim of the study was achieved through the experimental work which included engineering tests like: one dimensional oedometer testing and direct shear strength testing; and classification tests like: moisture content, bulk dry density, compaction, particle size analysis, and specific gravity tests. To provide a better understanding of the collapse behavior of the soil, classification tests were performed to make indicator analyses and evaluation of collapsibility potential using various empirical correlations. Based on the obtained results, soils from the area of study have a collapse potential values ranges from 3.81% to 5.89% and found moderate to highly collapsible types of soils in nature. From the findings of this study, as the Ethiopian Roads Authority site investigation manual does not consider the significant effects of these types of soils, the author suggests a direction in providing the design and construction specifications of problematic soils of collapsible types.Item NON - LANA RAENIL Y FO SIS S ITLUM DECARB LEET - NIER YROTS F CNOC DECRO R TE E FRA S(Hawassa University, 2018-07-18) A EYABM AP U SehT noitavitom ot poleved se cimsi r se i tnats serutcurts ets sm fr mo the laitnatsbus cimonoce sessol taht can eb esuac d by earthquake .egamad enO dohtem fo iveihca ng ies s cim re lis i ycne is to gised n bu gnidli s ac p elba of ser i gnits etal r la e tra hquake ,sdaol gnitapissid ,ygrene dna gniziminim ingis f aci nt larutcurts .egamad In siht yduts a luger ar ,net evlewt dna txis e ne yrots htiw ruof yab bu sgnidli ra e de dengis rof gr ytiva sdaol and dezylana rof es i ims c lo da sac e .s ehT gnicarb s evah neeb id detubirts ta the elddim and ruof renroc yrehpirep fo eht fo rts u erutc revo eht hgieh t ht ne non raenil mit e h tsi o yr sisylana saw ofrep rmed. effiD r tne sdnik fo st lee gnicarb s w ere used rof maxe ple rc o ss ,gnicarb rvehc on V( ,)gnicarb V 001 ,cirtnecce V 005 ec ec ,cirtn V 0001 ,cirtnecce dna V 0051 ec ec .cirtn ehT srebmun detpircsbus ped ict ht e ec icirtnec ty pr oisivo n in ch rve on br ica n sg ta eht pit ni temillim e .sr roF ereht si sorc s s lanoitce dna enffits ss noitairav ni itsiser ng laretal daol s neewteb b ,sgnicar ti aw s t eir d ot e etauq eht s it f ssenf eb twe ne orc ss carb i sgn sgnicarb fo tser eht ot cnamrofrep ehT.deiduts e fo ht e erutcurts w t no pu devorpmi sa he fo noisulcni s et el gnicarb s . ivorp naht retteB d carb gni i gn s oc eht ta r lddim yrehpirep ren e sgnicarb eyalpsid d a si ng tnacifi aretal l dr fi t r de u itc no . A noitcuder of umixam m aretal l yerots lpsid a tnemec of tuoba 36,%85 % %94, saw devresbo rof eht 01 , 21 and 61 - erots y elddim sorc s ecarb d b nidliu gs pser e evitc ly, co derapm to the as-bui tl on .e ehT ffe e tc fo gnidulcni yticirtnecce in sgnicarb smretni of l lareta alpsid cement and ni t yrotsre rd i tf w sa sid c essu d. lareneG l ,y m elddi yab carb ed dliub i sgn id s deyalp ecuder d laretal alpsid c me e tn dna yrotsretni tfird sa ew edivorp ce cen icirt ty. gninrutrevO emom nt ser i ecnats aercni ses htiw cni noisul fo ste le gnicarb eud ot ercni a es in eht o llarev its ffness of the rts u erutc aicepse lly nehw nisu g c sor s carb i .sgn gnisU sorc s gnicarb sah a etteb r l lareta alpsid c neme t gnicarb tser eht naht yticapac noitcuder s s idut e d i iht n s repap . ti yduts siht nI a saw l p taht detartsnomed os e airetirc ecnamrofr ac n b pmi e l etneme d not ylno rof gnittiforter wen nidliub gs tub also of r the de ngis fo new bu idli n sg thro hgu suoroger snoitareti rof a de engis r ed t re m ni ed ofrep r ecnam el ve .l In siht ts udy it w sa ed s ht ot deri mi e m de i l ecnamrofrep ycnapucco deta e ev lItem PERFORMANCE EVALUATION OF ANBESSA CITY BUS SERVICE ENTERPRISE TRANSPORT SERVICE: THE CASE OF ADDIS ABABA-BISHOFTU CORRIDOR(Hawassa University, 2018-03-25) TAMRAT BERARA GETUProviding and improving public transport service is becoming highly important to meet the demand of rapidly growing mass mobility due to high population growth and galloping urbanization in and around the city of Addis Ababa. Performance measurement is a popular activity in the transportation sector. Various studies on the performance of transportation systems with the utilization of data analysis have been common. In Addis Ababa-Bishoftu corridor public transport problem related to limited numbers of buses, insufficiency of bus routes, inadequacy of bus stops and operational deficiency are common. This research evaluate the performance of public transport service provided by Anbessa City Bus Service Enterprise (ACBSE) in the selected corridor. The study uses GIS techniques and Statistical (descriptive, correlation, factor and regression) analysis to assess the route network, travel speed, dwell time and passenger carrying capacity of the transport service. It has identified that there is route network gap for the town of Bishoftu and the current transport service in this corridor is poor. In addition to this the study assess the level of satisfaction of customers about the transport service provision of ACBSE in related to selected performance indicators such as frequency, travel speed, price, security, bus comfort, seat availability, vehicle overcrowding, punctuality and safety of the transport service. The study indicates that in the selected corridor there is very limited number of buses, there is high breakdown of buses and existing buses are not operating as per the schedule. Therefore, the service is found not reliable for travelers. Excessive waiting time and long walking distance to reach the service make it inconvenient. Moreover, high overcrowding and lack of seat inside the bus makes it uncomfortable. Correspondingly, the quality of the service is poor and customers are not satisfied about the transport service of ACBSE. In terms of LOS in most case the transport service operates at LOS D and lower. Thus to improve ACBSE transport service for Addis Ababa-Bishoftu corridor this research suggest that the extension of route network coverage for the town of Bishoftu, increase frequency of the transport service, upgrading the ticketing procedure, improving treatment of customers by bus operators and bus priority measures for high traffic congestion areasItem STABILIZATION OF EXPANSIVE SOIL WITH WASTE PLASTICS(Hawassa University, 2018-10-26) TEZETA MOGES ADANEExpansive soils have high amounts of clay particles and have a special mineralogical characteristic. The presence of considerable amount of montmorillonite clay mineral causes them to swell and shrink when amount of water is changed. Due to successive shrink and swell, this type of soil causes some asphalt distresses like upheaval, roughness, rutting and longitudinal cracking. To other extent, black cotton soils in construction sites do have xiv xv significant influence on planning, structural design, construction & maintenance costs, performance and engineering life of roads. There are many techniques to improve poor engineering properties of expansive soils. One of this is stabilization of expansive soil with waste plastic materials in the form of flexi which was introduced in this specific study. The stabilization of black cotton soil with optimum amount of flexi material decreased plastic index (PI) value by 13.6% and optimum moisture content (OMC) value by 18.5%, increased maximum dry density (MDD) value by 1.9%, increased California bearing ratio (CBR) value by 50.9%, increased Cohesion(C) value by 83.3% and increased both unconfined compressive strength (qu) and un-drained shear strength (Su) value by 10.1%. The flexi material gave better strength and stability by means of replacement of black cotton soil by flexi. Sand also used as a stabilizer material to magnify the effect of flexi stabilizer. In addition, the correlation and regression model was done by the result of the laboratory test results of OMC, MDD, CBR, C, and qu as dependent variables with the independent variables of percent (%) of flexi and PI in a single regression analysis. A good correlation and regression models were developed between percent of flexi and CBR, qu & Su. Coefficient of determination (R2 = 0.79) indicates that CBR has strong relation with % of flexi by having equation of𝐶𝐵𝑅 = (2.9909) − (0.3465 ∗ % 𝑜𝑓𝑓𝑙𝑒𝑥𝑖)Item IMPACTS OF ROAD CONSTRUCTION DELAY ON TRANSPORT COST AND BENEFIT A CASE STUDY ON HAGEREMARIAM -YABELO ROAD CONSTRUCTION PROJECT(Hawassa Unversity, 2018-10-11) SELAMAWIT KIFTAGA NAMAGACompletion of a project is considered as the most important factor of successes of road projects which helps to decrease problems for all concerned parties and give new chances to a county's economy. Delays in completion of road projects will result in significant loss of benefits for all road users. Accordingly, this research is carried out with the view of evaluating the impacts of road construction delays on transport costs and benefit considering Hageremariam-Yabelo Road. Questionnaire surveys were used to collect data on causes of delays and impact of delay on vehicle operating cost as well as an analysis was conducted by using the Likert Scale with mean score value. A total of 35 responded questionnaires from the client, consultants and contractors were collected. In addition, pertinent data were collected from vehicle operators on Hageremariam Yabelo Road project. Respondents identified twenty-seven (27) causes of delays and nine (9) impacts. The most important causes of delays were: delays to furnish and deliver the site (right of-way problem) and lack of possession of the site in various locations; variation of order (additional works not considered during the first time); and late site mobilization. The most common impacts of delays regarding vehicle operating cost were identified as; working hours per year (frequency of journey per day); tire consumption / tier-wear and average vehicle service life. This research also used the Highway Development and Management (HDM-4) tool in quantifying additional costs due to delays in respect of road agency and road user costs with the total loss of benefits. Using the Model, results were generated in the case of both alternatives (with delay and without delay) of the subject construction project. Overall, the 'with delay' alternative was compared with the 'without delay' alternative and the total transport costs increased by Birr 674.22 million. The amount of lost benefits from vehicle operating cost savings, travel time cost savings and accident cost reduction that resulted in the case of 'with delay' alternative was calculated at Birr 17.49 million. It is believed that these findings will guide to improve the performance of the construction industry of Ethiopia in the futureItem STABILIZATION OF EXPANSIVE SOIL BY USING COFFEE HUSK ASH(Hawassa University, 2018-10-18) REHMA MELKIE ALEMAYEHUExpansive soils have high potential for swelling and shrinking as a result of change in moisture content and they are one of the major soil deposits in Ethiopia. Road constructed on an expansive soil needs special attention during the design and construction stages. This study investigates the feasibility of using coffee husk ash as an expansive soil stabilizer. Coffee husk is a byproduct of coffee beans: when coffee husk is burnt under controlled condition (muffle furnace) at 550 oC for 4 hour the resulting ash is coffee husk ash (CHA). To investigate the effect of adding CHA to an expansive soil, laboratory experiments such as atterberg limit tests, free swell index tests, Proctor density, CBR test and unconfined compressive strength (UCS) tests were performed for different percentages of coffee husk ash (CHA). Standard Procter testes were conduct to evaluate the compaction behavior and unconfined compressive tests were performed on samples of 3.6 cm diameter and 7.8 cm height for uncured, 7 and 14 days of curing. The soil was stabilized with CHA in stepped concentration of 5%, 10%, 15% up to 30% by dry weight of the soil for different laboratory tests. Also the effect of curing period was evaluated over a period of 7 to 14 days for UCS and CBR tests. Analysis of the results shows improvement on the geotechnical properties of CHA stabilized soil. CHA reduces plasticity index by 68% up to 25% of CHA content, swelling ratio by 76% up to 20% CHA content and OMC decreased from 47% to 30% at 15% CHA content with an increase in MDD from 1.22 g/cm3 to 1.384 g/cm3. The UCS is also increased from 35.73kPa to314kPa and the un soaked and soaked CBR values increased from 16.2% to 21.5% and from 1.62 to 5.1% respectively after 14 day of curing and with the addition of 15% CHA content. After the addition of the optimum amount of the CHA the value of the laboratory tests are changed. From this investigation CHA is an alternative expansive soil stabilizing material sa it has changed and for further investigation use another stabilizing agent in addition to CHA to change the soil property from medium plastic to low plastic.Item INVESTIGATING SITE LAYOUT PLANNING AND IMPLEMENTATION PRACTICE IN BUILDING CONSTRUCTION PROJECTS(Hawassa University, 2018-07-14) SISAY TEMESGENBuilding projects in SNNPRS experience challenges of meeting project objectives due to an improper initial work management plan, which includes a site layout planning. Lack of proper site layout planning contributes to cost and time overruns in projects of the Region. Site layout planning utilization has implications for project safety, construction efficiency, scheduling, and budgetary performance of a project. The main purpose of this research was to investigate site layout planning and implementation practice in building construction projects in SNNPRS. The objectives of this study were identifying effects of poor site layout planning in building construction activities, identifying the key factors which contribute to achieving an effective site layout planning, and studying site layout plan utilization practice in building construction projects in SNNPRS and finally to provide practical procedure that can be referenced when developing site layout plan. The main approaches used in collecting information for the study were through a questionnaire survey, and personal observations of some major construction sites in SNNPRS in case of selected towns. The questionnaire survey was distributed to 40 respondents and a total of 36 responses were received. For the analysis of the data, statistical analysis by using mean score ranking and descriptive statistics were employed. The finding of the research indicated that the main impacts of poor site layout planning in building construction activities were a decrease in the output from labour and machinery, construction materials lost and damage, and increased travel distance on site. Availability of access and exit road to the construction site, location of plant and equipment, and positioning of temporary facilities were the major key factors which were found to be contributing to achieving an effective site layout planning. In the research, site layout plan utilization practice in building construction projects was also studied which led to development of a procedure describing an approach of site layout plan in construction projects. The procedure incorporates important aspects associated with project constraint identification, plan necessity, data acquisition, plan development, communication, implementation and enforcement, monitoring and evaluating, and documentation. This research contributes by providing information (factors) that one has to examine in order to have an effective and efficient site layout planning and also by bringing practical procedures and recommendations that can be referenced when developing site layout plan on the construction siteItem Importance of Labour Union for Improving Labour Productivity in Construction Projects; in Ethiopia Case of Omo Kuraz Sugar Factor(Hawassa University, 2018-10-29) Tsion Arega AdimassuConstruction sector need high involvement of labour workers. Fulfilling sufficient amount of qualified labour workers in appropriate time is very important for the efficiency of the sector. In other side, keeping the right of labour workers in over all respect is very important. To familiarize both the demand of labour workers in construction sector and assure the right and responsibility of labour workers, collecting labour workers in organization is one of the ways. Its main objective is assessing importance of labour workers union in improving labour productivity and completion of construction projects with in specific cost, time and quality. The study was conducted by using mainly quantitative method supplemented by qualitative study method. The research design is based on a purposive sampling selection process in terms of which a representative sample of stakeholders/participants in the construction process will be surveyed. Interviews, questioners and observations are data collection tools of this research. The data were also cleaned and checked for completeness and exported to SPSS 16.0 soft ware for analysis. As the finding show around 92.7% of the projects have no first aid clinic. Only 17.1% of the workers wear PPE. As stated in this finding, only 24.4% of workers have taken qualification measurement during employment. In case of work place condition only 9.8% of workers got training during or before working time, only 7.3%of the total projects covered in research area are got workers near project site so that there is high loss of time in mobilizing and employing. Finally the research states, all mentioned problems highly affect construction projects. Lack of qualification measurement, lack of training, unsafe working condition, time loss on mobilization of workers are major problems observed on the research which can highly affect construction projects cost, quality and time. Finally the research states that labour workers union are important on improving efficiency of construction projects so that, employers, labour workers and all concerning bodies Encouragement and support of formation of union are needed. This research contribution is mainly on identify the use of labour workers union in keeping quality, minimizing cost ,and completing project with specific time in building construction projects
